{"product_id":"spears-447-007-3-4-in-schedule-40-pvc-cap","title":"Spears 447-007 3\/4 in. Schedule 40 PVC Cap","description":"\u003cp\u003eClose off the end of a pipe run cleanly with the \u003cstrong\u003eSpears 447-007 3\/4 in. Schedule 40 PVC Cap\u003c\/strong\u003e. The small white dome has a single 3\/4 in. socket that slides over plain-end pipe or the spigot of a fitting and solvent-welds into a permanent seal, so a stubbed-out lateral, a future zone or an abandoned branch stays dry and out of the way. Molded PVC will not rust, resists chemicals in the soil and weighs almost nothing, and the fitting carries NSF certification for potable water alongside ASTM D1784 and D2466 compliance. Keep a few in the irrigation bin; they are the simplest way to end a line.\u003c\/p\u003e\u003ch3\u003eKey Features\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSocket end cap:\u003c\/strong\u003e Fits over 3\/4 in. plain-end pipe or a fitting spigot for a solvent-cemented closure.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTerminates a run:\u003c\/strong\u003e Seals the end of a lateral, a stub for a future zone or a line you have taken out of service.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCorrosion-proof PVC:\u003c\/strong\u003e Chemical and corrosion resistant, strong and light, with a maximum operating temperature of 140 F.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCertified:\u003c\/strong\u003e Meets ASTM D1784 and D2466 and is NSF certified for potable water service.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eAbout Spears:\u003c\/strong\u003e The 447 series is Spears Manufacturing’s Schedule 40 socket cap line, molded in white PVC in the U.S.A.\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eHow to Install It\u003c\/h3\u003e\u003cp\u003eCut the pipe square and deburr the edge, then dry-fit the cap to check the depth. Prime the outside of the pipe and the inside of the socket, apply solvent cement to both, push the cap on with a slight twist until it bottoms out and hold it for a few seconds. Let the joint cure for the time listed on the cement before charging the line. Use a cap to stub out a lateral where you plan to add a bed next season, to finish the end of a manifold or to blank off a zone you no longer water. If you expect to reopen the line often, thread a 435 series female adapter on the end and use a threaded plug instead, since a glued cap must be cut off to remove it.\u003c\/p\u003e\u003ch3\u003eSpecifications\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003ePart number: 447-007\u003c\/li\u003e\n\u003cli\u003eSize: 3\/4 in. socket\u003c\/li\u003e\n\u003cli\u003eMaterial: Schedule 40 PVC, white, molded\u003c\/li\u003e\n\u003cli\u003eMaximum operating temperature: 140 F\u003c\/li\u003e\n\u003cli\u003eStandards: ASTM D1784, ASTM D2466, NSF potable water\u003c\/li\u003e\n\u003cli\u003eMade in the U.S.A.; sold per fitting\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eStop by Garoppo’s Stone \u0026amp; Garden Center and Feed \u0026amp; Pet Supply to see it in person and pick one up, or schedule local delivery within our service area.\u003c\/p\u003e","brand":"Spears","offers":[{"title":"3\/4\"","offer_id":56316363440420,"sku":"60059","price":0.69,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0968\/5322\/9860\/files\/spears-spears-447-007-3-4-pvc-cap-soc-sch40-447-series-schedule-40-cap-socket-white_e2f9d0e8-956e-43b4-9995-639ffe9921f8.png?v=1789666867","url":"https:\/\/garoppos.com\/products\/spears-447-007-3-4-in-schedule-40-pvc-cap","provider":"Garoppo's Stone \u0026 Garden Center and Feed \u0026 Pet Supply","version":"1.0","type":"link"}